Availability: | |
---|---|
Quantity: | |
DFH20060B
D-FAN
air purifier
Thermal Plastic UL 94-0
1. Ball bearing 200x200x60mm Dc Fan with aluminum frame
型号 Model | 轴承类型 Bearing Type | 电压 Rated Voltage | 电压范围 Operation Voltage | 电流 Current | 转数 Speed | 风量 Air Flow | 风压 Static Pressure | 噪音 Noise Level | 重量 Weight |
VDC | VDC | A | RPM | CFM | mmH2O | dBA | g | ||
DFD20060B | Ball | 24 | 21.6~26.4 | 2.00 | 2800 | 595.00 | 65.00 | 74.4 | 1520 |
DFH20060B | 1.50 | 2500 | 531.00 | 58.20 | 67.0 | ||||
DFM20060B | 1.00 | 2200 | 467.00 | 51.50 | 55.8 | ||||
DFL20060B | 0.70 | 2000 | 425.00 | 46.40 | 46.5 | ||||
DFD20060B | Ball | 48 | 43.2~52.8 | 1.10 | 2800 | 595.00 | 65.00 | 74.4 | |
DFH20060B | 0.80 | 2500 | 531.00 | 58.20 | 67.0 | ||||
DFM20060B | 0.60 | 2200 | 467.00 | 51.50 | 55.8 | ||||
DFL20060B | 0.40 | 2000 | 425.00 | 46.40 | 46.5 |
2. Customer praise
3. Two production workshops, nine production lines, a monthly production capacity of 1.5 million units, and sufficient production capacity to ensure continuous supply capability.
Our partner and certificate
Our FAQ
Q: What is your MOQ and lead time?
A: Our MOQ is 1k PCS. Lead time is depends on the order's qty. Uusally, about 2~5 weeks after received payment.
Contact us
1. Ball bearing 200x200x60mm Dc Fan with aluminum frame
型号 Model | 轴承类型 Bearing Type | 电压 Rated Voltage | 电压范围 Operation Voltage | 电流 Current | 转数 Speed | 风量 Air Flow | 风压 Static Pressure | 噪音 Noise Level | 重量 Weight |
VDC | VDC | A | RPM | CFM | mmH2O | dBA | g | ||
DFD20060B | Ball | 24 | 21.6~26.4 | 2.00 | 2800 | 595.00 | 65.00 | 74.4 | 1520 |
DFH20060B | 1.50 | 2500 | 531.00 | 58.20 | 67.0 | ||||
DFM20060B | 1.00 | 2200 | 467.00 | 51.50 | 55.8 | ||||
DFL20060B | 0.70 | 2000 | 425.00 | 46.40 | 46.5 | ||||
DFD20060B | Ball | 48 | 43.2~52.8 | 1.10 | 2800 | 595.00 | 65.00 | 74.4 | |
DFH20060B | 0.80 | 2500 | 531.00 | 58.20 | 67.0 | ||||
DFM20060B | 0.60 | 2200 | 467.00 | 51.50 | 55.8 | ||||
DFL20060B | 0.40 | 2000 | 425.00 | 46.40 | 46.5 |
2. Customer praise
3. Two production workshops, nine production lines, a monthly production capacity of 1.5 million units, and sufficient production capacity to ensure continuous supply capability.
Our partner and certificate
Our FAQ
Q: What is your MOQ and lead time?
A: Our MOQ is 1k PCS. Lead time is depends on the order's qty. Uusally, about 2~5 weeks after received payment.
Contact us